Course Overview

Temperatures have fallen considerably over the past month, with a couple of frosty days, including a hard frost. Grass growth has slowed across the course, although it is encouraging that recovery has continued despite the cooler conditions. As we move further into autumn, our focus is on protecting grass cover, maintaining presentation and progressing seasonal work alongside routine maintenance.

The reduction in growth has allowed us to reduce mowing frequency and spend more time on other important jobs, including strimming, leaf clearance and tidying areas around the course. This provides an opportunity to improve areas that require more attention while continuing to maintain the main playing surfaces.

Greens

Mowing frequency on the greens has been reduced to four times per week, and the height of cut has been raised to 5 mm. These changes are intended to reduce stress on the grass and help retain coverage as growth slows. Fewer mowing operations also reduce machinery traffic across the surfaces during a period when recovery from wear is more limited.

The greens have received a feed containing a small amount of nitrogen alongside trace elements. The aim is to support plant health without encouraging excessive growth at this time of year. This approach reflects the change in growing conditions and the need to maintain healthy turf through the autumn and winter.

In addition, a fungicide has been applied to address Fusarium disease that had begun to appear on the course. These treatments form part of the work undertaken this month to protect the greens as growth and recovery slow.

General Maintenance

Work is underway to reduce the grass height on the tee banks so that suitable areas can be maintained with a ride-on mower. The aim is to make ongoing maintenance more efficient and achieve a cleaner, more consistent finish. This is a gradual process, with each bank requiring repeated strimming over a short period to remove the long, laid-over growth before regular mowing can take over.

The areas behind the 18th green and the 10th tee have been tidied, improving their overall appearance. The banks around the 15th tee have also been strimmed and the hedge cut, with the brambles removed. These jobs contribute to a more orderly presentation around the tees and surrounding areas.

On the 16th hole, a self-seeded oak and gorse that were obstructing the view of the green from the tee have been removed. This has opened up the view and provides a clearer visual line from the tee towards the green.

Winter Tees

The winter tee mat on the 4th hole has been completed. Work is now underway on the new winter tee mat positioned behind the 2nd green. These works form part of our preparations for winter play, with one installation complete and the second still in progress.

New Winter Courses for 2026/27

Following member feedback and a review of our winter course arrangements, the Club has introduced three officially rated winter tee sets for the 2026/27 season.

The new Competition (White), General (Yellow) and Forward (Red) courses have been rated for both men and women, allowing us greater flexibility in positioning tees throughout the winter while maintaining suitable playing options.

Winter Course Tee Markers Yardage

  • Competition White 5,878
  • General / Day Yellow 5,497
  • Forward Red 5,445

These arrangements will help us protect heavily used teeing areas, reduce wear and allow the greenkeeping team to make better use of existing grass tees and winter mats.

A detailed Winter Courses document has been produced, showing the proposed tee positions for all 18 holes, along with course ratings, yardages and temporary green arrangements.

We would encourage members to familiarise themselves with the new layouts, particularly where tee positions differ from those normally used.

VIEW THE WINTER TEE GUIDE

As always, the actual tee and green positions in use will depend on course and weather conditions.

Planned Aeration

A further round of aeration is planned for the greens, aprons and tees over the next couple of weeks. The timing of this work will need to take account of weather and ground conditions so that it can be carried out appropriately as we approach winter.

Course Tidiness

Leaf clearance remains a daily task as autumn progresses. Leaves continue to accumulate across the course, and keeping them under control takes a considerable amount of staff time alongside our other maintenance duties. Even after an area has been cleared, further leaf fall can quickly affect its appearance again.

We are working to keep the course as tidy as possible throughout this period and appreciate members' patience while this ongoing work is carried out.

Course Improvement Plan - Progress Update

Following the independent agronomy review undertaken by Bruce Jamieson earlier this year, we have been working through a structured programme of improvements to the greens.

Good progress has been made, including deep aeration work, refurbishment of specialist equipment, soil testing, investment in machinery, and the introduction of more consistent maintenance practices. During our autumn maintenance week, approximately 40 tonnes of topdressing was also applied to the greens.

Working alongside the Club Manager, we have now developed a detailed Greens Improvement Master Tracker and a proposed maintenance programme for 2027. This will help us plan and monitor essential work, including regular hollow tining, deep aeration, topdressing and turf nutrition.

As part of Bruce's recommendations, we have assessed 28 individual actions. Of these, 17 have been completed, nine are ongoing, two remain outstanding.

This represents encouraging progress, with the remaining actions now incorporated into our ongoing maintenance and improvement planning for 2027 and beyond.

For 2027, the proposed programme includes monthly dyno-core tining between April and August, alongside further aeration and increased topdressing applications.

These improvements will not happen overnight. Reducing organic matter, improving drainage and encouraging stronger root development is a gradual process, but the work being undertaken now is intended to deliver healthier, firmer and more consistent putting surfaces over the coming years.

We will continue to keep members updated on our progress through the monthly Course Reports.

Thank You

A sincere thank you to every member who has volunteered their time to help on the course.

Your support makes a significant difference to its condition and presentation, and the additional help is greatly appreciated by the greens team.

Kind regards,

Danny Gallagher
Course Manager
St Austell Golf Club